Factory Floor · Live Production · Est. 2019

PCB Assembly
That Shows Its Math

Bare boards in. Populated assemblies out. No hidden NRE, no vague lead times, no PDF DFM reports that say nothing.

Live
0hr
Quick-Turn
Prototype Turnaround
From Gerbers to populated board
0
CPH Placement
Component Rate
Yamaha YSM20R pick-and-place
0201
Component Capability
Smallest Package
0.25mm pitch BGA, QFN
0.0%
First-Pass Yield
Quality Rate
Across 847 production runs
IPC
Class 3 + ISO 9001
Certified Standard
Medical & aerospace qualified

Compare us. We built this page for exactly that.

01Solder Paste
02Pick & Place
03Reflow Oven
04AOI Inspect
The Case Against Your Current Supplier

Side by Side.
No Interpretation Needed.

Click any card to see the evidence — actual turnaround data, sample DFM reports, customer-verified timestamps.

01 — Comparison

The Quote

What you see vs. what you pay

Industry Standard

Looks cheap. Isn't.

  • NRE setup fee: $150–$400 buried in checkout
  • Stencil cost: separate line item, quoted later
  • Programming fee: $25/unique part
  • Fixture charge: disclosed after PO
  • Rush surcharge: 50–80% added at order
Average hidden add: $340 per prototype run
Solder

Flat BOM pricing. No surprises.

  • NRE: $0. Stencil amortized into unit price
  • Programming: included, no per-part fee
  • Fixtures: waived under 50 units
  • Rush: tiered, published on pricing page
  • Quote locks price for 14 days
Average prototype run: $280 all-in
VS
$340avg hidden fees at competitors

Verified Customer

"Got a quote from three houses. Solder was the only one where the invoice matched the quote."
Priya Mehta
Hardware Lead, Volta Robotics (San Francisco, CA)

Data verified by customer timestamp logs · Last updated Feb 2026

02 — Comparison

The DFM Review

Generic PDF vs. annotated Gerbers back in 4 hours

Industry Standard

A PDF that says nothing.

  • Generic checklist: 12 items, all green
  • No layer-specific comments
  • Silkscreen overlap: flagged as "minor"
  • Pad-to-trace clearance: not checked
  • Response time: 3–5 business days
You find the tombstoning at AOI, not before
Solder

Annotated Gerbers. Real issues. 4 hours.

  • Layer-by-layer markup in your CAD format
  • Paste volume flagged for 0402 on Rev B
  • Via-in-pad called out before stencil cut
  • BGA escape routing verified at 6-mil trace
  • Response: 4 hours from Gerber upload
Issues caught before stencil saves $600+ rework
VS
4hrDFM turnaround, verified average

Verified Customer

"They caught a paste bridge risk on our QFN ground pad that three other shops missed. Board came back perfect."
Marcus Webb
Contract Engineer, Austin, TX

Data verified by customer timestamp logs · Last updated Feb 2026

03 — Comparison

The Lead Time

Estimated vs. timestamped and tracked

Industry Standard

"7–10 business days" means nothing.

  • Clock starts when they feel like it
  • No portal, no timestamps, no tracking
  • Slippage: +3–5 days, communicated day-of
  • Expedite: unquoted, negotiated via email
  • Delivery confirmation: shipping email only
You find out it's late when it's late
Solder

Every station. Timestamped.

  • Order confirmed → stencil cut: same business day
  • Paste print timestamp logged to portal
  • Placement complete: notification sent
  • Reflow exit + AOI pass: photo proof uploaded
  • Ship confirmation with FedEx tracking
94% of orders ship within committed window
VS
94%on-time delivery, last 180 days

Verified Customer

"We were requalifying after a missed delivery. Solder's portal showed us every step. We could see the board in reflow."
Chen Wei
Procurement Engineer, Meridian Systems (Boston, MA)

Data verified by customer timestamp logs · Last updated Feb 2026

Every row makes you more uncomfortable about your current supplier. Good.

Step 1: Upload. Step 2: Compare. Step 3: Decide.

Upload Gerbers for a
Side-by-Side Quote

We quote against your current supplier's price. If we're not cheaper and faster, we'll tell you.

Drop Gerbers + BOM here

.zip, .gbr, .ger, .drl, .brd, .kicad_pcb · Max 50MB

Browse Files

No sales call. Quote emailed within 4 hours. Price locked 14 days.

Verified Customer Results

Hardware Founders. OEM Engineers.
Real Deadlines Met.

"Uploaded Gerbers at 9pm. DFM report with annotated layers in my inbox by 1am. Boards shipped Friday. Nothing else comes close."

James Okafor, Founder at Kinetic Labs, Brooklyn NY
James Okafor
Kinetic Labs, Brooklyn NY
22hr
Gerbers to shipped

"Our previous shop missed delivery by 9 days and charged us a rush fee on top. Solder quoted 5 days, shipped in 4, invoiced exactly what was quoted."

Ananya Krishnan, Procurement Engineer at Meridian Systems, Boston MA
Ananya Krishnan
Meridian Systems, Boston MA
$0
surprise charges

"Five panels of Rev B, 0402 passives, two BGAs. Turned in 72 hours. AOI report showed zero defects. Our demo ran on boards still warm from the oven."

Tyler Brennan, Contract Engineer at Austin, TX
Tyler Brennan
Austin, TX
0
defects at AOI

"The portal is the product. I could watch my board move through each station. When AOI flagged one component, they called me before I even refreshed."

Sarah Lindqvist, Hardware Engineer at Volta Robotics, San Francisco CA
Sarah Lindqvist
Volta Robotics, San Francisco CA
4hr
issue notification

"I sent the same Gerbers to four shops. Three quoted $680–$940. Solder quoted $310, all-in, with a stencil and DFM. Boards were better than the expensive ones."

Raj Patel, CTO at Sensorium Inc., Chicago IL
Raj Patel
Sensorium Inc., Chicago IL
54%
lower than competitors

"IPC Class 3 isn't a checkbox here. They refused to ship a board that passed their own AOI because a tech noticed a solder bridge under the stereo scope."

Christine Nakamura, Quality Engineer at Apex Medical Devices, Minneapolis MN
Christine Nakamura
Apex Medical Devices, Minneapolis MN
IPC-3
standard enforced

"Uploaded Gerbers at 9pm. DFM report with annotated layers in my inbox by 1am. Boards shipped Friday. Nothing else comes close."

James Okafor, Founder at Kinetic Labs, Brooklyn NY
James Okafor
Kinetic Labs, Brooklyn NY
22hr
Gerbers to shipped

"Our previous shop missed delivery by 9 days and charged us a rush fee on top. Solder quoted 5 days, shipped in 4, invoiced exactly what was quoted."

Ananya Krishnan, Procurement Engineer at Meridian Systems, Boston MA
Ananya Krishnan
Meridian Systems, Boston MA
$0
surprise charges

"Five panels of Rev B, 0402 passives, two BGAs. Turned in 72 hours. AOI report showed zero defects. Our demo ran on boards still warm from the oven."

Tyler Brennan, Contract Engineer at Austin, TX
Tyler Brennan
Austin, TX
0
defects at AOI

"The portal is the product. I could watch my board move through each station. When AOI flagged one component, they called me before I even refreshed."

Sarah Lindqvist, Hardware Engineer at Volta Robotics, San Francisco CA
Sarah Lindqvist
Volta Robotics, San Francisco CA
4hr
issue notification

"I sent the same Gerbers to four shops. Three quoted $680–$940. Solder quoted $310, all-in, with a stencil and DFM. Boards were better than the expensive ones."

Raj Patel, CTO at Sensorium Inc., Chicago IL
Raj Patel
Sensorium Inc., Chicago IL
54%
lower than competitors

"IPC Class 3 isn't a checkbox here. They refused to ship a board that passed their own AOI because a tech noticed a solder bridge under the stereo scope."

Christine Nakamura, Quality Engineer at Apex Medical Devices, Minneapolis MN
Christine Nakamura
Apex Medical Devices, Minneapolis MN
IPC-3
standard enforced

"IPC Class 3 isn't a checkbox here. They refused to ship a board that passed their own AOI because a tech noticed a solder bridge under the stereo scope."

Christine Nakamura, Quality Engineer at Apex Medical Devices, Minneapolis MN
Christine Nakamura
Apex Medical Devices, Minneapolis MN
IPC-3
standard enforced

"I sent the same Gerbers to four shops. Three quoted $680–$940. Solder quoted $310, all-in, with a stencil and DFM. Boards were better than the expensive ones."

Raj Patel, CTO at Sensorium Inc., Chicago IL
Raj Patel
Sensorium Inc., Chicago IL
54%
lower than competitors

"The portal is the product. I could watch my board move through each station. When AOI flagged one component, they called me before I even refreshed."

Sarah Lindqvist, Hardware Engineer at Volta Robotics, San Francisco CA
Sarah Lindqvist
Volta Robotics, San Francisco CA
4hr
issue notification

"Five panels of Rev B, 0402 passives, two BGAs. Turned in 72 hours. AOI report showed zero defects. Our demo ran on boards still warm from the oven."

Tyler Brennan, Contract Engineer at Austin, TX
Tyler Brennan
Austin, TX
0
defects at AOI

"Our previous shop missed delivery by 9 days and charged us a rush fee on top. Solder quoted 5 days, shipped in 4, invoiced exactly what was quoted."

Ananya Krishnan, Procurement Engineer at Meridian Systems, Boston MA
Ananya Krishnan
Meridian Systems, Boston MA
$0
surprise charges

"Uploaded Gerbers at 9pm. DFM report with annotated layers in my inbox by 1am. Boards shipped Friday. Nothing else comes close."

James Okafor, Founder at Kinetic Labs, Brooklyn NY
James Okafor
Kinetic Labs, Brooklyn NY
22hr
Gerbers to shipped

"IPC Class 3 isn't a checkbox here. They refused to ship a board that passed their own AOI because a tech noticed a solder bridge under the stereo scope."

Christine Nakamura, Quality Engineer at Apex Medical Devices, Minneapolis MN
Christine Nakamura
Apex Medical Devices, Minneapolis MN
IPC-3
standard enforced

"I sent the same Gerbers to four shops. Three quoted $680–$940. Solder quoted $310, all-in, with a stencil and DFM. Boards were better than the expensive ones."

Raj Patel, CTO at Sensorium Inc., Chicago IL
Raj Patel
Sensorium Inc., Chicago IL
54%
lower than competitors

"The portal is the product. I could watch my board move through each station. When AOI flagged one component, they called me before I even refreshed."

Sarah Lindqvist, Hardware Engineer at Volta Robotics, San Francisco CA
Sarah Lindqvist
Volta Robotics, San Francisco CA
4hr
issue notification

"Five panels of Rev B, 0402 passives, two BGAs. Turned in 72 hours. AOI report showed zero defects. Our demo ran on boards still warm from the oven."

Tyler Brennan, Contract Engineer at Austin, TX
Tyler Brennan
Austin, TX
0
defects at AOI

"Our previous shop missed delivery by 9 days and charged us a rush fee on top. Solder quoted 5 days, shipped in 4, invoiced exactly what was quoted."

Ananya Krishnan, Procurement Engineer at Meridian Systems, Boston MA
Ananya Krishnan
Meridian Systems, Boston MA
$0
surprise charges

"Uploaded Gerbers at 9pm. DFM report with annotated layers in my inbox by 1am. Boards shipped Friday. Nothing else comes close."

James Okafor, Founder at Kinetic Labs, Brooklyn NY
James Okafor
Kinetic Labs, Brooklyn NY
22hr
Gerbers to shipped
Not Ready to Quote?

Download Our Pricing
vs. Industry Average

A 6-page breakdown comparing our all-in pricing against the industry average across 12 board configurations — from 1-layer simple to 6-layer HDI with BGAs. Real numbers, no rounding.

Prototype pricing: 1–5 boards across 8 configurations
NRE fee comparison across 7 major contract manufacturers
DFM turnaround time data: industry average vs. Solder
Lead time variance analysis: Q4 2024 through Q1 2026
Pricing vs. Industry Average
6 pages · PDF · Updated Feb 2026

No spam. One email with the PDF. Unsubscribe in one click.

847
Production Runs
99.7%
First-Pass Yield
4hr
DFM Response
Factory Live
Upload GerbersPricing PDF